一、总则 General

1、本规程适用于压力容器的气密性试验的操作过程管理。 This specification applies to control of air tight test during operation. 2、本规程对换热器的管程、壳程均适用。 This specification is applicable to tube side and shell side of the heat exchanger. 3、本规程同时适用于扬巴二期项目位号为 E-2300 的设备。 This specification is also applicable to the equipment (item no: E-2300) for IPS II project. 二、内容 Content

1、试验通用条件 General testing condition ⑴气密性试验应有专门的试验场地,并应有可靠的安全防护设施。 Special testing site shall be set for the air tight test, and safe guard facilities shall be furnished. ⑵ 试验用的工装应为经过设计、审核并验证过的合格工装。 Testing assembly shall be designed, reviewed and certified as per acceptable assembly. ⑶ 试验前连接部位的紧固螺栓必须装配齐全,紧固妥当。 Connecting parts shall be assembled with tightened bolts prior to testing. ⑷按工艺文件要求, 试验时至少应采用两个量程相同且经过计量校验合格的压力表, 并应安 装在被试验容器的顶部便于观察的位置。 As a minimum requirement, two pressure gauges with same measuring range and acceptable meter shall be used, and the pressure gauges shall be installed in a visible place for inspection. ⑸ 试验过程检查期间压力应保持不变, 不得采用连续加压来维持试验压力不变, 且试验过 程中不得带压紧固螺栓或向受压元件施加外力。


相关文章:
Leakage Test Procedure 气密.pdf
Leakage Test Procedure 气密 - 气密性试验通用规程 Air Tight Test Specification 一、总则 General 1、本规程适用于压力容器的气密性...
工艺管线气密试验程序.doc
PNEUMATIC LEAKAGE TEST PROCEDURE 工艺管线气密试验程序 Plant: Client: PP+HDPE CSPC Contractor: TISA 编号 Ref.No: NH- HDPE+PP- WPR-212 REV:A Page 1 ...
EIA-364 (连接器产品常用测试规范之目录).pdf
Leakage Test Procedure for Electrical Connectors 空气渗漏电子连接器的测试程序?...电子连接器和(或)端子系统的气密特性测试程序 Contact Engagement and Separation...
QAC-MC-107Q Leakage testREVLON(露华浓)+欧莱雅 测试方法.txt
Leakage test 气密性测试 Cancels and Supersede
049-基本IC测试原理介绍_图文.ppt
Leakage Test Method ? Leakage 测试方法 ? Input Pin Leakage : 对电源Pin Leakage IIH , 对地Pin Leakage IIL ? Input Signal Pin Leakage: Pull-Up Pin ...
压力试验程序-英中对照译文.doc
PRESSURE TEST PROCEDURE 压力试验程序 Prepared by: 编制: Reviewed by: 审核:...7. Gastightness Testing (Leakage Testing) 7 气密性试验(泄露试验) 7.1 ...
AHU Leakage test.xls
1471 Leakage rate LPS/m2 0.44 1.02 Total Total Leakage Leakage LPS CMH 37 133 33 120 * AHU Leakage Test Schematic * AHU Leakage Test Procedure 1. ...
pressure_test_procedures.pdf
During each hold period, check for leakage by monitoring the ability of ...HIGH PRESSURE HYDRO TEST PROCEDURE (SUMMARY ONLY) 16. All personnel working...
压力容器水压试验.doc
1 HYDROSTATIC PRESSURE TEST PROCEDURE 水压试验程序 ...test and no leakage be found form any joints. ...的压缩空气对所有焊缝连接部位 进行气密性检查合格。...
5-Test procedure_图文.pdf
5-Test procedure_专业资料。简要介绍资料的主要内容,以获得更多的关注 ...Precautionary laboratory practices must be followed to prevent the leakage of ...
T-639(Leakage Current Test Procedure for KitchenAid....pdf
T-639(Leakage Current Test Procedure for
...Ball-Valves-Inspection-and-Test-Procedures.pdf
Technical Standard API6D Ball & Plug Valve Inspection & Test Procedure 1 ...Acceptance Criteria for Closure Test (ISO5208) Seat Leakage Rate Soft Seated...
Hydrotest Procedure.doc
procedure 8页 5财富值 Procedure 58页 10财富值 procedure p 18页 免费 RA_...The test result shall be accepted if there is no leakage of soap bubble....
MES1-1-044 for high pressure durability test procedure.doc
MES1-1-044 for high pressure durability test procedure_机械/仪表_工程科技_...? Hydraulic leakage test (MES 1 - 1 - 035 ) ? Residual drag test (...
Tank Hydrostatic Test Procedure - FINAL_图文.doc
Tank Hydrostatic Test Procedure - FINAL_能源/化工_工程科技_专业资料。罐试压...If any leakage is not appeared on the welds and connection, the hydrotest...
EIA-364-20D-2008 WITHSTANDING VOLTAGE TEST PROCEDURE....pdf
EIA-364-20D-2008 WITHSTANDING VOLTAGE TEST PROCEDURE..._机械/仪表_工程科技...Leakage current if other than specified in 2.1.5 5.6 Define test specimen...
EIA-364-02C Air Leakage Test Procedure for Electric....pdf
EIA-364-02C Air Leakage Test Procedure f
JASO C448-1980 乘用车钳盘式制动器台架试验规程.pdf
51 . Leakage Test Procedure (4) Apply the fluid pressure of 140 kgf/cm2 { 13.72 MPa} for one minute, and check if there is leakage. Remark - ...
4.2 TEST PROCEDURE FOR RISER.pdf
4.2 TEST PROCEDURE FOR RISER_能源/化工_工程科技_专业资料。这是一个关于海洋...This pressure be maintained for at least 8 hours to check the leakage. ...
Procedure-DucTester Pressurization.pdf
Procedure-DucTester Pressurization_机械/仪表_工程科技_专业资料。This is the ...Residential Duct Test Procedures total house and duct leakage under ...
更多相关标签: